Overview
Adman Int was appointed by Caledonia Contracts to deliver a programme of fire door installations at the Old Course Hotel, St Andrews. The works formed part of a wider refurbishment and compliance programme within a luxury hospitality environment, requiring a controlled and quality-led approach throughout.
The project involved the installation of 69 new certified fire doorsets within a live hotel setting, with works carefully coordinated to maintain guest experience, operational continuity and high standards of finish.
Scope of Works
The scope comprised the supply and installation of new fire doorsets across designated areas of the hotel.
Works delivered included:
-
Installation of 69 new certified fire doorsets
-
Installation of complete doorset assemblies, including frames, ironmongery and closers
-
Integration of fire doors within existing finishes and architectural detailing
-
Quality checks and final inspections prior to handover
All installations were completed in accordance with manufacturer instructions, tested systems and relevant fire safety standards.
Programme & Environment
The works were delivered over a defined programme from 25 August 2025 to 30 September 2025, within a live luxury hotel environment.
Key considerations included:
-
Working within an operational five-star hotel
-
Coordinating works alongside refurbishment activities
-
Maintaining guest safety, privacy and experience
-
Managing access, noise and logistics discreetly
-
Achieving high standards of finish appropriate to the setting
Our Approach
Adman Int adopted a highly planned and quality-focused delivery approach, working closely with Caledonia Contracts to integrate the fire door installations within the wider project programme.
Works were carefully sequenced to minimise disruption, with operatives maintaining professional conduct and high standards of workmanship at all times. Installations were completed by trained, in-house personnel under competent supervision, with ongoing checks to ensure compliance and finish quality.
Outcome
The project was successfully delivered within the agreed programme and budget. All 69 fire doorsets were installed to the required standard, supporting the hotel’s fire safety strategy while maintaining the aesthetic and operational requirements of a luxury hospitality environment.
This project demonstrates Adman Int’s ability to deliver compliant fire door installations within high-end, operational settings, balancing technical compliance with programme control and quality of finish.